Get Mystery Box with random crypto!

Midas( Bridges) I) General introduction(1 hr), II) Major Drain | Construction Proxy

Midas( Bridges)
I) General introduction(1 hr), II) Major Drainage Structures(Bridges) , ●Superstructure -Slab Bridge Design(10 hrs), T-Girder Bridge Design(15 hrs), Box Girder Bridge Design(10 hrs)
●Substructure Design - Abutment Design(5 hrs) ,Pier Design(10 hrs)
III)Minor Drainage Structures (Culverts)- Box Culvert Design(10 hrs), Slab Culvert Design(5 hrs), Retaining Wall Design● Bridge and Culverts Drawing Preparation ,and Detailing     (5hrs), IV) Bill of Quantity Preparation (BOQ) (5hrs)● Manuals: - AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, - ERA MANUAL 2013● Softwares - AutoCAD,Ms-Excel,Midas Civil
● Option 1. Sat & Sun Mor( 3:00-7:00) ,LT. ● Option 2.Only Sun Afternoon (8:00-1:00), LT ● Option 3.Online(Virtually) Via Zoom link,
Tg:- https://t.me/BeGetEngineering
Megenagna, Marathon Bldg, Office No.614 ፦ 0911890392 / 0920933016
contact @belaychane
You can also use this form to register https ://docs.google.com/forms/d/e/1FAIpQLSfO9PYBv866aZCRIc3q-0Y2tlc9y3hBTy845krjHs-1nOz1tA/viewform?usp=pp_url